Permits in Fairfield go through the city's Building Safety Division, which reviews new construction and changes to existing structures, so on a job that needs a permit, the review and the inspections set part of the schedule. When yours does, we handle the application and set up the inspections through the city's online permit system, and I check your address with the office rather than guess. Before you hire anyone, ask for two things: a California contractor's license and a City of Fairfield business license. The questions below explain when each one applies, and we're licensed and insured.
What moves the price here is mostly what's under and around the slab: how much old concrete has to be broken out and hauled off, how far down we dig to reach firm subgrade, the ground the new base sits on, whether a truck can reach the pour or we wheel it in, and the finish, since a broom finish, the brushed texture that keeps feet from slipping, costs less than stamped or colored work. The schedule turns on permit review when there is one, the weather on pour day, and curing, the time the concrete needs to harden before you walk on it and longer before you drive on it. Your written estimate lays all of that out for your job, and we work the same way next door in Suisun City and over in Davis.